Goodwe DT Series User Manual

Solar inverter

Advertisement

SEMS Portal App
LinkedIn
Company's Offical
Website
GOODWE (Germany)
Fürstenrieder Str. 279a 81377 München, Germany
T: +49 8974120210 +49 421 83570-170 (service)
sales.de@goodwe.com
service.de@goodwe.com
GOODWE (Netherlands)
Franciscusdreef 42C, 3565AC Utrecht, the Netherlands
T: +31 (0) 30 737 1140
sales@goodwe.com
service.nl@goodwe.com
GOODWE (India)
1202, G-Square Business Park, Sector 30A, Opp. Sanpada
Railway Stn., Vashi, Navi Mumbai- 400703
T: +91 (0) 2249746788
sales@goodwe.com / service.in@goodwe.com
GOODWE (Turbutton)
Adalet Mah. Megapol Tower K: 9 No: 110 Bayraklı - Izmir
T: +90 (232) 935 68 18
info@goodwe.com.tr
service@goodwe.com.tr
GOODWE (Mexico)
Oswaldo Sanchez Norte 3615, Col. Hidalgo, Monterrey,
Nuevo Leon, Mexico, C.P. 64290
T: +52 1 81 2871 2871
sales@goodwe.com / soporte.latam@goodwe.com
Note: The information above is subject to change without prior notice, for details refer to
www.goodwe.com
GOODWE (China)
No. 90 Zijin Rd., New District, Suzhou, 215011, China
T: +86 (0) 512 6958 2201
sales@goodwe.com (sales)
service@goodwe.com (service)
GOODWE (Brazil)
Rua Abelardo 45, Recife/PE, 52050-310
T: +55 81 991239286
sergio@goodwe.com
servico.br@goodwe.com
GOODWE (UK)
6 Dunhams Court, Dunhams Lane, Letchworth
Garden City, SG6 1WB UK
T:+ 44 (0) 333 358 3184
enquiries@goodwe.com.uk / service@goodwe.com.uk
GOODWE (Italy)
Via Cesare Braico 61, 72100 Brindisi, Italy
T: +39 338 879 38 81; +39 831 162 35 52
valter.pische@goodwe.com (sales)
operazioni@topsenergy.com; goodwe@arsimp.it (service)
GOODWE (Australia)
Level 14, 380 St. Kilda Road, Melbourne,
Victoria, 3004, Australia
T: +61 (0) 3 9918 3905
sales@goodwe.com / service.au@goodwe.com
GOODWE (Korea)
8F Invest Korea Plaza, 7 Heoleung-ro
Seocho-gu Seoul Korea (06792)
T: 82 (2) 3497 1066
sales@goodwe.com / Larry.Kim@goodwe.com
DT/SDT SERIES USER MANUAL
SOLAR INVERTER

Advertisement

Table of Contents
loading

Summary of Contents for Goodwe DT Series

  • Page 1 T: +31 (0) 30 737 1140 Garden City, SG6 1WB UK sales@goodwe.com T:+ 44 (0) 333 358 3184 service.nl@goodwe.com enquiries@goodwe.com.uk / service@goodwe.com.uk GOODWE (India) GOODWE (Italy) 1202, G-Square Business Park, Sector 30A, Opp. Sanpada Via Cesare Braico 61, 72100 Brindisi, Italy Railway Stn., Vashi, Navi Mumbai- 400703...
  • Page 2: Table Of Contents

    1 Symbols ..........................2 Safety Measures & Warning ............... 3 Product Introduction ..................3.1 Grid Compatibility ........................04 3.1 Inverter Overview ........................04 3.2 Package ............................05 4 Installation ........................4.1 Mounting Instructions ....................... 06 4.2 Equipment Installation ......................06 4.3 Electrical Connection ........................
  • Page 3: Symbols

    • PV modules should have an IEC61730 class A rating. Refer to operation instructions • If the equipment is used in a manner not specified by the GOODWE, the protection provided by the equipment's design may be impaired. • To completely isolate the equipment : switch off the DC switch, disconnect the DC terminal, and Wait at least 5 minutes after disconnecting the inverter before disconnect the AC terminal or AC breaker.
  • Page 4: Product Introduction

    3.1 Grid Compatibility but also mobile phone App interface. DT series GW10KLV-DT ~ GW25K-DT and SDT series support four different types of grid. • The inverter can exclude the possibility of DC residual currents to 6mA in the system,Where an...
  • Page 5: Package

    [1] Positive & Negative DC plug: Item Name Description DT15~20KW 4 pairs; PV Input Terminal For PV string connection 12KWLV 4 pairs; During normal operation it is in "on" state, it can shut down DC Switch (Optional) 15KWLV, 25KW 6 pairs; the inverter after it is disconnected from the grid by the AC breaker.
  • Page 6: Installation

    6. Install the unit at eye level to for convenient operation and maintenance. 7. Install the unit vertically or tilted backwards of no more than 15 degrees, and wiring area should should be facing downwards. 400mm DT series 457mm Backboard Installation 228.5mm...
  • Page 7: Electrical Connection

    4.3 Electrical Connection Value of Conductor Material Sectional Area refer to the following table. 4.3.1 Connection To Grid (AC Side Connection) Model Conductor Material Sectional Area Model Conductor Material Sectional Area 1. Measure the voltage and frequency of grid-connected access point, and make sure it is in GW12KLV-DT 6~10mm GW17K-DT...
  • Page 8: Communication Connection

    4.3.3 AC Circuit Breaker And Residual Current Protection Device DC Cable specification. In order to ensure that the inverter can be safe and reliable to disconnect from the power grid, please install an independent circuit breaker to protect the inverter. Grade Description Value...
  • Page 9 Step 1: Screw this plate off from inverter. 3. The choice of 120 ohm termination resistor dip switch (DT series only). • If there is single DT series inverter, RS485 connection cable with waterproof terminal can RS485 realize the connection...
  • Page 10 "Wi-Fi Configuration Instruction" in the accessory box. After configuration, please browse the monitoring portal website to create PV station The WiFi module installation of DT series are shown as below. Connect the cable terminal with the external WiFi module 4.4.4 Export Power Limit Connection Diagram...
  • Page 11 4.4.5 DRED / Remote Shutdown / Smart Meter(Power Limiting Device) Connection Step 2-3 For Smart Meter: DRED (Demand response enabling device) is only for Australian and New Zealand installations, in Put the cable through the connector and compliance with Australian and New Zealand safety requirements. And DRED is not provided by connect to the terminal.
  • Page 12: System Operation

    5.1.1 Indicator Lights Short press to browse the safety country list available. Choose suitable safety country according DT series. to the location of installation. The inverter will store the chosen safety country after 20 seconds if no further operation is performed.
  • Page 13 First Level Menu Second Level Menu First Level Menu Second Level Menu Enter Enter Normal Error Log Error Log Utility Over Normal Error Log Error Log Utility Over Data&Time Data&Time Loss Temperatur Data&Time Data&Time Loss Temperatur ........Language Language 13:12:25 13:29:25 Down...
  • Page 14 Area③ -Histogram Display: 5.2.3 Use Of The LCD Area③ uses histogram to demonstrate the average power generation at each hour from 4:00am to The buttons near the LCD screen are mainly used for inverter information display, setting of 8:00pm on one day. Each columnar points 20 scale, the left top area shows the maximum rated time, language selection and histogram information display.
  • Page 15: Wifi Reset & Wifi Reload

    "Enter", it shows "Shadow ON" indicatin g shadow mode has been successfully turned on. Long Press Enter Down Shadow OFF LVRT OFF Limit OFF Limit ON Limit ON (Only available for DT series.) Long Press ESC PV Adjust 100% Rated 100% Rated 100% Rated Power Limit Press Up or Down to This function is used for special requirements.
  • Page 16: Precaution For Initial Startup

    6 Troubleshooting Error Code Error message Description SPI Failure Internal communication failure If the Inverter is not able to work properly, please refer to the following instructions before contacting your local service. If any problems arise, the red (FAULT) LED indicator on the front EEPROM R/W Failure Memory chip failure panel will light up and the LCD screen will display relevant information.
  • Page 17: Technical Parameters & Block Diagram

    7 Technical Parameters & Block Diagram Type of fault Troubleshooting 7.1 Technical Parameters Relay-Check Failure DCI Injection High Technical Data GW4000-DT GW5000-DT GW6000-DT GW8000-DT PV String Input Data EEPROM R/W Failure Max. DC Input Power (W) 5200 6500 7800 9600 SCI Failure Max.
  • Page 18 Technical Data GW10KN-DT GW12KN-DT GW15KN-DT GW17KN-DT GW20KN-DT Technical Data GW4000L-DT GW5000L-DT GW6000L-DT GW10KL-DT PV String Input Data PV String Input Data Max. DC Input Power (W) 12000 16800 19500 22100 26000 Max. DC Input Power (W) 5200 6500 7800 9600 Max.
  • Page 19 Technical Data GW12KLN-DT GW12KLV-DT GW15KLV-DT Technical Data GW17K-DT GW20K-DT GW25K-DT DC Input Data PV String Input Data Max. PV Power (W) 21600 15600 19500 Max. DC Input Power (W) 22100 26000 32500 Max. DC Input Voltage (V) Max. DC Input Voltage (V) 1000 1000 1000...
  • Page 20: Block Diagram

    7.2 Block Diagram Note: Overvoltage Category Definition SDT4~10KW main circuit. Category I: applies to equipment connected to a circuit where measures have been taken to reduce transient overvoltage to a low level. Switch PV1+ Category II: applies to equipment not permanently connected to the installation. For example, appliances, portable tools and other plug-connected equipment;...
  • Page 21: Caution

    Filter 8.1 Clearing The Fan 3-level Inverter Filter DT series inverter is equipped with three fans on its left side. The fan intakes and handle covers PV2+ Circuit Filter MPPT2 should be cleaned yearly with a vacuum cleaner. For more thorough cleaning, completely...
  • Page 22: Checking The Dc Switch

    SDT17KW/20KW 8.2 Checking The DC Switch DC switch does not require any maintenance Though unnecessary, maintenance as below is still recommended: • Check the DC switch regularly. • Activate the DC switch 10 times in a row once a year. Operating the switch will clean the switch and will extend the life of the DC switch.
  • Page 23 5.2 Syetem Configuration 5.2.1 Set Safety County: Short press the button until LCD displays "Configure Safety", and long press "Enter" to enter the second level menu. Press the "Up" or "Down" to browse the safety country available. Select suitable safety country according to the location of installation. The chosen safety will be setted and saved with long pressing "Enter".

This manual is also suitable for:

Sdt seriesGw10klv-dtGw25k-dt

Table of Contents