Inverter Parameter Introduction - Goodwe SDT Series User Manual

Grid-tied pv inverter
Hide thumbs Also See for SDT Series:
Table of Contents

Advertisement

08 System Commissioning

8.1.2 Inverter Parameter Introduction

Parameters
Normal
Date Time
VPv
IPv
Vac
Iac
Fac
E-Today
E-Total
Serial Number
GW10K-SDT-30
RSSI
Firmware M/S
Comm Version
Set Language
Set Safety
Set Date
Set Time
W/L Reset
W/L Reload
PF Adjust
Description
Home page. Indicates the real-time power of the inverter.
Check the time of the country/region.
Check the DC input voltage of the inverter.
Check the DC input current of the inverter.
Check the voltage of the utility grid.
Check the AC output current of the inverter.
Check the frequency of the utility grid.
Check the generated power of the inverter for that day.
Check the total generated power of the inverter.
Check the serial number of the inverter.
Check the signal strength of the communication module.
Check the firmware version.
Check the communication version.
Set the display language.
Set the safety country/region in compliance with the local grid
standards and application scenario of the inverter.
Set time according to the actual time in the country/region where the
inverter is located.
Power off and restart the communication module.
Restore the factory settings of the communication module.
Reconfigure the communication module network parameters after
restoring the factory settings,
Set the power factor of the inverter according to the actual situation.
User Manual V1.3-2024-01-25