Goodwe SDT Series User Manual page 16

Grid-tied pv inverter
Hide thumbs Also See for SDT Series:
Table of Contents

Advertisement

03 Product Introduction
Non-China (GW8000-SDT-30, GW10K-SDT-30, GW10K-SDT-EU30, GW12K-SDT-30,
GW15K-SDT-30)
No.
Parts
1
DC Switch
2
PV Input Terminal
3
Communication Terminal
Communication Module
4
Terminal
5
AC Output Terminal
6
Indicator
7
LCD (optional)
8
Button (optional)
9
Grounding Point
10
Ventilation Valve
11
Mounting Plate
12
Heat Sink
Description
To start or stop DC input.
To connect the PV module DC input cables.
To connect the communication cable such as
RS485, smart meter, Emergency Power Off, Remote
Shutdown, Dry Contact, DRED(for Australia only) or
RCR(for Germany only).
• To connect the communication moduled such as
WiFi, LAN, Bluetooth or 4G.
• To connect USB flash drive for local software
upgrating (for Non-Brazil machines).
• To connect to a computer via RS485-USB cable for
function configuration(for Brazil only).
Used to connect AC output cable. Connect the
inverter and the utility grid.
To indicate working state of the inverter.
To check the parameters of the inverter.
To control contents displayed on the screen.
To connect the PE cable.
-
To mount the inverter.
For the ventilation of the inverter.
12
User Manual V1.3-2024-01-25

Advertisement

Table of Contents
loading

Table of Contents