Goodwe SDT Series User Manual page 33

Grid-tied pv inverter
Hide thumbs Also See for SDT Series:
Table of Contents

Advertisement

User Manual V1.3-2024-01-25
06 Electrical Connection
Step 1 Prepare the AC cable.
Step 2 Disassemble the AC terminal cover.
Step 3 Crimp the AC cable into the OT terminals, and lead the crimped cable into the AC cable.
Step 4 Remove the wiring baffle on the AC terminal block and the cable fixing screws.
Step 5 Tighten AC cable into the AC terminal block.
Step 6 Tighten the AC terminal cover into the inverter.
6
.
1.2~1.8 N m
29

Advertisement

Table of Contents
loading

Table of Contents