07 Equipment Commissioning

7 Equipment Commissioning

7.1 Check Before Power ON

No.
1
The product is firmly installed at a clean place that is well-ventilated and easy-to operate.
2
The PE, PV input, and AC output cables are connected correctly and securely.
3
Cable ties are intact, routed properly and evenly.
4
Unused ports and terminals are sealed.
The voltage and frequency at the connection point meet the inverter on-grid
5
requirements.

7.2 Power On

Step 1 Connect the PV connectors between the inverter and the PV module.
Step 2 Turn on the AC breaker between the inverter and the utility grid.
PV connector
PV module
1
Inverter
Check Item
2
Power distribution
unit (AC breaker)
24
User Manual V1.0-2023-07-30
Utility grid