Floor Space Requirements - ABB Terra 94 UL Operation And Installation Manual

Table of Contents

Advertisement

"Operation and installation manual" - "Terra 94/124/184(NEVI) UL"
48

6.2.2 Floor space requirements

X1
B
Parameter Description
A
EVSE (front side indicated by red arrow)
B
Example of approved bollard location
X1
Space to open the side doors
X2
Reduced side space to install the bollards
Space needed to secure the removable
Y1
base cover
Y2
Increased front space to install the bollards 23
Y3
Space to open the front door
NOTE
These dimensions only refer to the required space to open the doors of the EVSE. A minimum of
1 m extra on front, left and right sides is required to allow commissioning and maintenance
operations on the EVSE.
Y1
X2
A
X1
X2
B
Y3
Specification
[in]
21
12
4
19
Y2
[mm]
533
305
102
585
483