"Operation and installation manual" - "Terra 94/124/184(NEVI) UL"
46
6.1.2
Components supplied with the EVSE
When the EVSE is unpacked, make sure all components supplied with the EVSE are present:
Component
6.2
Installation of the EVSE
6.2.1
Install the charging cables on the optional CMS
If the EVSE is equipped with CMS (51), the charging cables must be hooked up on the respective CMS using
the Cable clamp (53).
Description
Keys to open the EVSE front door
Nuts to install the EVSE to the floor
Bolts + Washers + Nuts to install AC and
PE cables
Caps to be installed in place of the
eyebolts
53
51
Quantity
2
6
4 + 8 + 4
(Preinstalled on the
AC terminals and PE
busbar)
4