Transport The Evse To The Site; Visual Inspection On The Packaged Evse - ABB Terra 94 UL Operation And Installation Manual

Hide thumbs Also See for Terra 94 UL:
Table of Contents

Advertisement

"Operation and installation manual" - "Terra 94/124/184(NEVI) UL"
32
4.1

Transport the EVSE to the site

A transport company delivers the EVSE close to the site. The movement of the EVSE to its final location is their
responsibility.
NOTE
If you need to store the EVSE before installation, obey the ambient conditions for storage (refer
to section
DO NOT store the equipment in a location exposed to severe weather conditions (e.g. rain, snow
or a high level of humidity).
CAUTION
It is prohibited to transport or handle the EVSE unless authorized. Respect the following safety
measures!
WARNING
Please follow these steps to comply with the applicable Safety measures applicable to the
working area including instructions for safe handling of the EVSE
DANGER
Handling personnel must wear all appropriate and applicable personal protective equipment
(PPE) and follow all the applicable Health and Safety measures applicable to the working area.
NOTE
The manufacturer is not liable for any damages resulting from the improper handling and
transportation of the EVSE, in particular resulting from non- compliance with these instructions
and other applicable regulations and standards (e.g. transport, occupational health and other
safety standards).
4.1.1

Visual inspection on the packaged EVSE

• Check and respect the indications of the symbols on the packaging:
Symbol
Description
Handle with care
Fragile
Keep dry
Center of gravity
This side Up
Do not stack
Do not tilt
"10.1.2. Environmental
Conditions").

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra 124 ulTerra 184 ul

Table of Contents