ABB Terra 94 UL Operation And Installation Manual page 45

Table of Contents

Advertisement

Installation
45
• Spread the cardboard on both sides.
• Remove the two main parts of the packaging.
• Take out the supplied components. Refer to
"6.1.2.
Components supplied with the
EVSE").
• Remove the internal foams.
• Remove the charging cable from the box.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra 124 ulTerra 184 ul

Table of Contents