Installation
A
18
The mechanical installation of the EVSE is completed and the electrical connections can be done.
• Open the front (02) and right doors (13) of the EVSE
when is near to ground. Refer to section
the internal parts"
• Remove the three Main AC protection barriers (42).
Refer to section
"5.4.1. Remove the Main AC protection
barriers".
• Carefully lower the EVSE on the floor/foundation.
During this phase the cables must be aligned and
routed through the Cables entry plate (43):
− L1, L2, L3, Protective Earth PE (A)
− Ethernet (optional) (B)
− Signals (optional) (C)
A
43
Risk of pinching or crushing of body parts
Make sure that cables do not get trapped
between the EVSE and the base and that
are aligned to the AC and PE connection
terminals.
NOTE
Align the 8 holes in the EVSE to the
threaded studs on the foundation.
CAUTION
Make sure that there are no kinks in the
cables
• Install the 8 fasteners to secure the EVSE to the
foundation.
• Remove the Lifting points (Eyebolts) (18) on the roof.
• Install the caps (A), each with a flat washer and a split
lock washer.
51