Inverter Installation; Moving The Inverter; Installing The Inverter - Goodwe ETC Series User Manual

Hybrid/ac-coupled inverter 50kw&100kw
Hide thumbs Also See for ETC Series:
Table of Contents

Advertisement

User Manual V1.0-2023-04-30
Installation Tool Requirements
The following tools are recommended when installing the equipment. Use other auxiliary tools
on site if necessary.
Goggles
Diagonal
pliers
Multimeter

5.2 Inverter Installation

5.2.1 Moving the Inverter

• Operations such as transportation, shipment, installation and so on shall in compliance
withthe laws and regulations of the country or region where the inverter is located.
• Move the inverter to the site before installation. Follow the instructions below to avoid
personal injury or equipment damage.
1. Consider the weight of the equipment before moving it. Assign enough personnel to
move the equipment to avoid personal injury.
2. Wear safety gloves to avoid personal injury.
3. Keep balance to avoid falling down when moving the equipment.

5.2.2 Installing the Inverter

• Make sure the inverter is firmly installed in case of falling down.
Safety
shoes
Wire
Heat shrink
stripper
Cable tie
CAUTION
NOTICE
Safety
Dust mask
gloves
Vacuum
tube
cleaner
25
05 Installation
Heat gun
Torque wrench

Advertisement

Table of Contents
loading

Table of Contents