Goodwe ETC Series User Manual page 22

Hybrid/ac-coupled inverter 50kw&100kw
Hide thumbs Also See for ETC Series:
Table of Contents

Advertisement

03 Product Introduction
No.
Parts
6
Battery circuit breaker (BAT1,
BAT2)
7
AC circuit breaker (GRID)
8
Emergency stop button
9
MPPT input circuit breaker
(MPPT1, MPPT2)
10
Load breaker (LOAD)
11
Heat sink
12
Communication ports
13
DC input terminal (MPPT1, MPPT2)
14
Battery input terminal (BAT1,
BAT2)
15
Load cable terminal (LOAD)
16
Grounding Point (PE)
17
AC output terminal
Description
Starts or stops battery input and output.
Starts or stops on-grid AC output.
Press the button for emergency protection.
• Starts or stops PV input.
• Only for ETC series.
Starts or stops back-up AC output.
For heat dissipation.
Connects communication cables, including RS485
cable, BMS cable, CAN cable, DRED cable, RCR
cable, smart meter cable, remote shutdown cable,
LAN cable.
• Connects PV input cables.
• Only for ETC series.
Connects battery cables.
Connects load cables.
Connects the grounding cable.
Connects the AC output cable.
18
User Manual V1.0-2023-04-30

Advertisement

Table of Contents
loading

Table of Contents