4 Check and Storage

4.1 Check Before Receiving

Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and other
signs of equipment damage. Do not unpack the package and contact the supplier as soon as
possible if any damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact
the supplier as soon as possible if any damage is found.

4.2 Deliverables

M8*16 screw for hybrid inverter x 10. M8*16 screw for AC-coupled inverter x 6.
Prepare the PV connectors for connecting the DC input cables according to the recommended
specifications. Severe damage might happen if other types of connectors or terminals are
used, which are beyond the manufacturer's liability.
Inverter x 1
2PIN Com-
munication
terminal x 7
Wiring sep-
Wiring separate
arate board
board (BAT,
(MPPT, LOAD)
GRID) x 5
x 6
4PIN Com-
munication
terminal x 9
NOTICE
WARNING
Screw-
driver
x 1
M8*16
M8*20
screw x N
screw x 9
21
04 Check and Storage
Core
Hoist
ring x 1
ring x 4
Documents x 1