Terminal
J3
J4
J5
J6
J7
J8 ~J10
J11-J12
J13
J14
J15
J16
J18
J20
J21
J22
J23
J24
J25
J26
J27
Note: DO4 ~ DO6 is used as an internal function and can not be set by the user; J20 and J21 can not be used at the same time
4. Replace the new monitoring board, and then reinstall the controller according to the above reverse steps.
Replacement of PCB board
NOTE! Take care should be taken when replacing components of the controller. Unplugging terminals optionally
may result in system shut down. Carry out the replacement sequentially according to the following procedures.
The procedures for replacing PCB are described as follows:
1. Unplug the J8 power supply terminal to power off the PCB.
2. Unplug other terminals and DI/DO cables.
3. Wrap the DI/DO cable terminals with insulating tape. To prevent short circuit, keep the disconnected terminals and
cables insulated from components of the power system and the PCB.
Definition
RS485 communication terminal
(Downlink, connect the
background monitoring)
Display interface
DI input terminal
Do output terminal 1
DO output terminal 2
Temperature sensor terminal
Load fuse interface
Battery fuse and current shunt
interface
Battery mid-point voltage
AC input terminal
LLVD / Battery control output
terminal
JTAG debugging port
RS232 communication port
RS485 communication port
(Uplink, sub equipment)
Ethernet port and USB
IIC interface
DO output terminal 3
FAN & Alarm
DC Meter
Reserved debugging interface
Vertiv™ NetSure™ 731 C62 Series Power System User Manual
Wiring instruction
J3_1: RS485_1A
J3_2: RS485_1B
J3_3: RS485_2A
J3_4: RS485_2B
Display rectifier control
Dry contact input
Dry contact output
Dry contact output
Connect the battery temperature and the ambient temperature
sensor, which can be set
Load fuse / MCB status sampling
Load fuse / MCB status sampling, battery shunt signal sampling
Measure battery mid-point voltage
AC voltage sampling input
LLVD / Battery protection signal output
/
J20_1: DTR: Data terminal ready
J20_2: RXD: RS232 receive data
J20_3: TXD: RS232 transmit data
J20_4: DCD: Data carrier detect
J20_5: DGND: Communication circuit reference ground
J21_1: RS485_A
J21_2: RS485_B
Ethernet port connector RJ45 and USB port
/
Dry contact output
PWM fan control interface
Route 4 user current and Electricity metering interface
/