Vertiv™ NetSure™ 731 C62 Series Power System User Manual
Figure 2.6 Connection terminals (back view)
Grounding terminal
Neutral line busbar
Connecting AC cables
1. Connect the AC input phase cables to the AC input MCB, as shown in Figure 2.7. The figure shows the two routes of
mains input MCB configuration.
Figure 2.7 Connection terminals (front view)
AC input MCB
Rectifier MCB
AC output MCB
2. If the power system is configured with AC output MCB, connect the AC output cables to the AC output MCB, and
connect the AC output neutral line to the neutral busbar, as shown in Figure 2.6 and Figure 2.7.
Connecting load cables
NOTE! The total capacity of the priority loads should not exceed 100A.
Connect the negative load cable to the upper terminal of the load MCB or load fuse. Connect the positive load cable to
the DC positive busbar, as shown in
5