3.4 Handling and placement

Warning: The battery pile's power terminals are high voltage DC. It must be installed in a
restricted access area;
Warning: Force-H1 is a high voltage DC system, operated by qualified and authorized
personnel only.

3.4.1 Handling and placement of the battery module

Single battery module is 36kg. If without handling tools must have more than 2 men to
handling with it.

3.4.2 Handling and placement of the base

The base is light, single person can handle with it.

3.4.3 Selection of installation sites

A. Force-H1-V2 system working temperature range: 0℃~50℃; Optimum temperature:
18℃~28℃. Do not place the battery system in direct sun light. It is suggested to build
sunshade equipment. In cold area the heating system is required.
B. Force-H1-V2 system must not be immersed in water. Cannot be placed the battery base
in rain or other water sources. As a suggestion, the base's height shall >300mm above the
ground.
C. The base's weight capacity should support the weight of whole battery system
(130~300kg).
D. Force-H1-V2 system bust be installed on fixed ground.