65
17
STEP 10
1. According for the figure, install the lead handles (16#) and (17#) on the front upper beam (11#) and
secure with bolts (68#) and spacer (74#).
2. Place the installed (11#) holes on both sides of (31#) and secure with bolt (65#), gasket (74#), and nuts
(71#).
16
| ASSEMBLY INSTRUCTIONS
31
74
74
11
16
68
65
Need help?
Do you have a question about the SM26 Multi Gym and is the answer not in the manual?