Reinstall The Wiring Box Cover; Apply Power To The Unit; Reattach The Pump Lower - Graco E-Flo EM0011 Repair Parts

Dc motor
Hide thumbs Also See for E-Flo EM0011:
Table of Contents

Advertisement

Reinstall the Wiring Box Cover

1. Connect the wires from the inside of the wiring box.
Refer to the torque instructions listed on the
placard inside of the wiring box. Connect the
power cable and/or conduit to the electronics cover.
2. Reinstall the cover onto the wiring box.
3. Using a 6 mm hex wrench, install the four bolts.
NOTE: Ensure the lock washers are still in place.
4. Torque the bolts to 15 ft-lb (20 N•m).

Apply Power to the Unit

1. Apply power to the unit to start the automatic
calibration process. The motor output shaft runs up
3A4801G
Control Board Replacement Kits 24U934, 24U935, 24U936, and 24U937
and down over the course of several minutes.
Halfway through the automatic calibration process,
the motor output shaft pauses as it moves to the
next step.
2. Ensure that the automatic calibration process is
complete before you continue.

Reattach the Pump Lower

1. Jog the output shaft on the pump lower and
reconnect the coupling nut.
2. Torque to the proper level according to the
appropriate pump manual.
39

Advertisement

Table of Contents
loading

Table of Contents