2 - INSTALLATION OF UNIT

2.7 - Check before start the unit

Never be tempted to start the heat pump without reading fully, and 
understanding,  the  operating  instructions  and  without  having 
carried out the following pre-start checks:
■ Ensure that all electrical connections are properly tightened.
■ Ensure that the unit is level and well-supported.
■ Check that the hydraulic circuit has sufficient water flow and 
that the pipe connections correspond to the installation diagram.
■ Ensure  that  there  are  no  water  leaks.  Check  the  correct 
operation of the valves installed.
■ All  panels  should  be  fitted  and  firmly  secured  with  the 
corresponding screws.
■ Make  sure  that  there  is  sufficient  space  for  servicing  and 
maintenance purposes.
■ Ensure that there are no refrigerant leaks.
■ Confirm that the electrical power source agrees with the unit 
nameplate rating, wiring diagram and other documentation for 
the unit.
■ Ensure  that  the  power  supply  corresponds  to  the  applicable 
standards.
■ Make sure that compressors float freely on the mounting rubber 
grommet.
CAUTION:
■ Commissioning and start-up of the heat pump must be
supervised by a qualified refrigeration qualified technician.
■ Start-up and operating tests must be carried out with a
thermal load applied and water circulating in the water heat
exchanger.
■ All set point adjustments and control tests must be carried
out before the unit is started up.
Ensure that all safety devices are operational, and that any alarms 
are acknowledged.
NOTE:
If the Manufacturer instructions (power and water connections
and installation) are not observed, the Manufacturer warranty
becomes invalid.