8 - START-UP CHECKLIST FOR NXHP HEAT PUMPS (USE FOR JOB FILE)
8.1 - General information
General information
Job name
Location
Installing contractor
Distributor
Start-up performed by
Equipment
Unit type
Serial number
Software version [P654]
Compressor
Air handling equipment
8.2 - Available options and accessories
Option / Accessory
Backup heater
Water filling system
Base panel heater
Master / Slave sensor
Domestic hot water management sensor
Remote human interface
Additional outdoor ambient temperature sensor
8.3 - Checks before start of unit
Is there any shipping damage?
Unit is level in its installation
Power supply agrees with the unit name plate
Electrical circuit wiring has been sized and installed properly
Unit ground wire has been connected
Unit neutral wire has been connected
All terminals are tight
All cables and thermistors have been inspected for crossed wires
All plug assemblies are tight
All air handlers are operating
All water valves are open
All fluid piping is connected properly
All air has been vented from the system
Water pump is operating with the correct rotation
Water pump control has been properly interlocked with the heat pump
Unit has been leak checked (including fittings): Locate, repair, and report any refrigerant leak
All incoming power voltage is within rated voltage range
Date
Model number
Serial number
Manufacturer
Model number
Serial number
Yes
No
Yes
No
Comment
81