1. Click
2. Click Setting next to Schedule to configure the alarm period.
The system performs linkage actions only for alarms during the arming period.
3. Configure alarm linkage. For details, see Table 5-50 .
4. Click Apply.
Select Enable checkbox and then click Apply.
Step 7
5.9.7.2.5 Parking
When the detection target stays in the monitoring area longer than the set duration, the system
performs alarm linkage action.
Procedure
Select Main Menu > AI > Parameters > IVS.
Step 1
Figure 5-146 Schedule and alarm linkage
.
On the time line, drag to set the period.
You can also click
to set the period.