Safety Instructions During Transport; Safety Instructions For Earthing; Safety Instructions For Use - ABB ADC-90-200-C1 Operation And Installation Manual

All-in-one 90kw dc fast charger
Table of Contents

Advertisement

Safety
Make sure that the load capacity of the grid is in accordance with the EVSE.
Earth the EVSE correctly. Refer to section 2.8.
Make sure that the wiring inside the EVSE is protected from damage and cannot
get trapped when you open or close the cabinet.
Make sure that water cannot enter the cabinet.
Protect the EVSE with safety devices and measures that the local rules specify.
If it is necessary to remove safety devices, immediately install the safety devices
after the work.
Put on the correct personal protective equipment. Refer to section 2.5.
2.7

Safety instructions during transport

Preliminary requirements
Make sure that the hoisting equipment or forklift truck can lift the EVSE safely.
Take into account the mass and the center of gravity of the EVSE.
Obey the safety instructions that apply to the hoisting equipment or the forklift
truck.
Put on the correct personal protective equipment. Refer to section 2.5.
2.8

Safety instructions for earthing

Preliminary requirements
Make sure that the EVSE is connected to a grounded, metal, permanent wiring
system, or an equipment-grounding conductor must be run with the circuit
conductors and connected to the equipment grounding terminal or lead on the
product.
Make sure that the connections to the EVSE comply with all applicable local
rules.
2.9

Safety instructions for use

In these situations, do not use the EVSE and immediately contact the
manufacturer:
16
Installation engineer
An enclosure has damage.
An EV charge cable or connector has damage.
Lightning struck the EVSE.
There was an accident or a fire at or near the EVSE.
Water has entered the EVSE.
9AKK108466A3703-EN | 001

Advertisement

Table of Contents
loading

Table of Contents