Overview Of The Evse, Inside - ABB ADC-90-200-C1 Operation And Installation Manual

All-in-one 90kw dc fast charger
Table of Contents

Advertisement

Description
Part
Border cover
EV charge cable outlet and
holder
RFID reader
Payment terminal
Emergency stop button
Touchscreen
Enclosure
Antenna
3.4.3

Overview of the EVSE, inside

A
B
C
D
E
F
Part
Main breaker 2
Main breaker 1
PE busbar
Fused surge protection
device
26
K
J
I
H
G
Main breaker 2
Main breaker 1
PE busbar
Auxiliary breaker
Fused surge protection device
Ethernet connection
Function
To cover the lower part of the EVSE
To connect and hold the EV charge cable. Refer to sec-
tion 3.7.
To read the information from an RFID card
To pay for the charge session
To stop the EVSE when there is an emergency
To control and monitor the charge session
To reduce the accessibility of unqualified persons to
the inside of the EVSE
To send and receive wireless 3G and 4G signals
G
Cable gland plate
H
AC input fuse
I
Auxiliary AC fuse
J
RCD breaker
K
Power modules
Function
To connect or disconnect the power modules group 2
To connect or disconnect the power modules group 1
To connect the PE cable
Fuse to protect the surge protection device, that pro-
tects teh EVSE against overvoltage
A
B
C
D
E
F
9AKK108466A3703-EN | 001

Advertisement

Table of Contents
loading

Table of Contents