Cable Slack; Height Of User Operable Elements - ABB ADC-90-200-C1 Operation And Installation Manual

All-in-one 90kw dc fast charger
Table of Contents

Advertisement

Technical data
10.12.9

Cable slack

Parameter
Required cable slack for the Ethernet ca-
ble (measured from the top of the foun-
dation)
Required cable slack for the AC input ca-
ble (measured from the top of the foun-
dation)
10.12.10

Height of user operable elements

A
Z1
Z2
Z3
Parameter
ADA recom-
mendations
EVSE
86
Z1
Z2
A
Ground level
Maximum height of the user
operable elements according to
ADA
Lowest height of the user operable
elements according to ADA
EVSE highest user operable
element
Z1
Z2
Z3
Specification
[mm]
500
350
Z5
Z6
Z4
EVSE lowest user operable element
Z5
EVSE base
Z6
Curb
Specification
Standard
[mm]
[in]
1212
48
381
15
1212
48
[in]
20
14
Z3
Z4
Base with reduced height
[mm]
[in]
1212
48
381
15
1092
43
9AKK108466A3703-EN | 001

Advertisement

Table of Contents
loading

Table of Contents