Local Service Portal Operations; Start The Local Service Portal; Set The Configuration Parameters; Set The Ocpp Parameters - ABB ADC-90-200-C1 Operation And Installation Manual

All-in-one 90kw dc fast charger
Table of Contents

Advertisement

6.8

Local service portal operations

6.8.1

Start the local service portal

Preliminary requirements
Procedure
1. Open the front door of the EVSE. Refer to section 8.1.
The HMI starts the local service portal application. The outside HMI goes into
idle mode. On the inside HMI, the authorization screen shows.
2. Enter the pin code.
3. Select
6.8.2

Set the configuration parameters

1. Go to the configuration screen.
2. Wait for the system to load the data. This can take a few seconds.
3. Set
4. Set the maximum AC input current in amperes.
The AC input current field has no maximum value. The correct AC input value is
the responsibility of the service engineer.
5. Save your changes.
6.8.3

Set the OCPP parameters

1. Go to the OCPP settings screen.
2. Wait for the system to load the data. This can take a few seconds.
3. Select and enter the data for these subjects:
4. Make sure that you type the URL or ID correctly and without spaces.
5. Obey the maximum number of allowed characters for URL and ID, that is 40.
6. Select
entered.
7. Select
9AKK108466A3703-EN | 001
The EVSE is ready for operation. No charge session is in progress.
No charge session is in progress.
Continue .
Authorization to ON or OFF. Use the toggle button.
OCPPJID
OCPPJURL
OCPPJPassword
Confirm password
Set OCPP parameters to confirm the configuration parameters that you
Save to save your changes.
Operation
63

Advertisement

Table of Contents
loading

Table of Contents