Cloud Service Portal - ABB ADC-90-200-C1 Operation And Installation Manual

All-in-one 90kw dc fast charger
Table of Contents

Advertisement

Screen name
Status screen
Hardware screen
Hardware test screen
Configuration main screen To set the following data :
OCPP settings screen
3.12

Cloud service portal

ABB EV Infrastructure provides a set of cloud-based tools to commission,
monitor and troubleshoot the EVSE. Please refer to the manufacturer's e-Mobility
representative for more information.
9AKK108466A3703-EN | 001
Function
To give information about the EVSE:
EVSE serial number
EVSE release number
Number of power modules
To give a status overview of the key components in the
EVSE, providing information such as:
Type: the name of the component
Status: the health status
Details: if available, the reason for an error
To give detailed information about the key compo-
nents of the EVSE:
Name
Serial number
Software version
Node-id
Position
The hardware page has two buttons:
Navigation button: to go to the Hardware test
screen
Trigger discovery : to install new
Action button
software
To navigate to various hardware tests
Authorization on or off
Maximum AC input current
To set the configuration parameters, refer to section
6.8.2
To set the following data :
OCPPJURL
OCPPJID
OCPPJPassword
Confirm password
To set the OCPP parameters, refer to section
Description
6.8.3
37

Advertisement

Table of Contents
loading

Table of Contents