In-Rush Current; Maintenance Schedule For The Service Engineer - ABB ADC-90-200-C1 Operation And Installation Manual

All-in-one 90kw dc fast charger
Table of Contents

Advertisement

10.19

In-rush current

Current peaks during the start of a charge session
Parameter
Duration of the current peaks on the AC
input side
Maximum current peak (for 400V & 50 Hz and 480V & 60 Hz)
Parameter
Terra 94
Terra 104/124
Terra 184
Rated peak withstand current [kA peak]
Parameter
Terra 94
Terra 104
Terra 124
Terra 184
Rated short-time withstand current [kA rms]
Parameter
Terra 94
Terra 104
Terra 124
Terra 184
10.20

Maintenance schedule for the service engineer

Part name
Filter inlet kit
Filter outlet kit
Fan cabinet
Power module
DC fuse 200 A
9AKK108466A3703-EN | 001
Note: The heater will operate daily when the outside air reaches the
dew point, to avoid condensation inside the cabinet. When the heater
operates, the heater will use most of the required standby power.
Years after startup
0
1
2
3
-
R
R
R
-
R
I
R
-
I
I
I
-
I
I
I
-
I
I
I
Specification [µs]
25
Specification [A]
< 120
< 150
< 170
Specification [kA]
6.625
6.625
6.625
6.625
Specification [kA]
2.65
2.65
2.65
2.65
4
5
6
7
8
9
10 11 12 13 14 15
R
R
R
R
R
R
R
I
R
I
R
I
R
I
I
R
I
I
I
I
R
I
I
I
I
I
I
R
I
R
I
I
I
I
R
Technical data
R
R
R
R
R
R
I
R
I
R
I
I
I
I
R
I
I
I
I
I
I
I
I
I
R
111

Advertisement

Table of Contents
loading

Table of Contents