Removal And Reinstallation Of The Operation Panel - Mitsubishi Electric FR-A520-0.4K Instruction Manual

Hide thumbs Also See for FR-A520-0.4K:
Table of Contents

Advertisement

1.3.3

Removal and reinstallation of the operation panel

To ensure safety, remove and reinstall the operation panel after powering off.
• Removal
Hold down the top button of the operation panel and pull the operation panel toward you to remove.
When reinstalling the operation panel, insert it straight and reinstall it securely.
• Reinstallation using the connection cable
1) Remove the operation panel.
2) Disconnect the modular jack type relay connector. (Place the disconnected modular jack type relay
connector in the modular jack type relay connector compartment.)
3) Securely plug one end of the connection cable into the PU connector (modular jack type relay
connector) of the inverter and the other end into the operation panel. (Refer to page 25 for the
connection cable.)
Note: Install the operation panel only when the front cover is on the inverter.
Removal
Modular jack type relay connector
7
Get other manuals https://www.bkmanuals.com
Reinstallation
Modular jack type relay connector compartment
OUTLINE
1

Advertisement

Table of Contents
loading

Table of Contents