Removal And Reinstallation Of The Operation Panel Or The Front Covers - Mitsubishi Electric 800 Series Hardware Instruction Manual

Separated converter type
Hide thumbs Also See for 800 Series:
Table of Contents

Advertisement

2.2
Removal and reinstallation of the operation panel
or the front covers
 Removal and reinstallation of the operation panel
• Loosen the two screws on the operation panel.
(These screws cannot be removed.)
To reinstall the operation panel, align its connector on the back with the PU connector of the inverter, and insert the operation
panel. After confirming that the operation panel is fit securely, tighten the screws. (Tightening torque: 0.40 to 0.45 N·m)
 Removal of the front cover (lower side)
(a)
(a) When the mounting screws are removed, the front cover (lower side) can be removed. (The number of the mounting
screws differs by the capacity.)
(b) With the front cover (lower side) removed, wiring of the main circuit terminals can be performed.
• Press the upper edge of the operation panel while pulling
out the operation panel.
(b)

2.2 Removal and reinstallation of the operation panel or the front covers