Removal And Reinstallation Of The Operation Panel Or The Front Covers - Mitsubishi Electric FR-A872-P Instruction Manual

Table of Contents

Advertisement

2.2
Removal and reinstallation of the operation panel
or the front covers
 Removal and reinstallation of the operation panel
• Loosen the two screws on the operation panel.
(These screws cannot be removed.)
To reinstall the operation panel, align its connector on the back with the PU connector of the inverter, and insert the operation
panel. After confirming that the operation panel is fit securely, tighten the screws. (Tightening torque: 0.40 to 0.45 N·m)
 Removal of the upper main circuit terminal cover
(a) Remove the mounting screws to remove the upper main circuit terminal cover.
(b) With the cover removed, terminals P and N can be wired.
• Press the upper edge of the operation panel while pulling
(a)

2.2 Removal and reinstallation of the operation panel or the front covers

out the operation panel.
(b)
2. INSTALLATION AND WIRING
1
2
3
4
5
6
7
8
9
10
23

Advertisement

Table of Contents
loading

Table of Contents