Removal And Reinstallation Of The Operation Panel And The Front Covers - Mitsubishi Electric FR-CC2-H355K Instruction Manual

F800 series, fr-f802 separated converter type
Hide thumbs Also See for FR-CC2-H355K:
Table of Contents

Advertisement

2.2
Removal and reinstallation of the operation
panel and the front covers
Removal and reinstallation of the operation panel
• Loosen the two screws on the operation panel.
(These screws cannot be removed.)
To reinstall the operation panel, align its connector on the back with the PU connector of the inverter, and insert the operation
panel. After confirming that the operation panel is fit securely, tighten the screws. (Tightening torque: 0.40 to 0.45 N·m)
Removal of the front cover (lower side)
(a)
(a)
When the mounting screws are removed, the front cover (lower side) can be removed. (The number of the mounting screws
differs by the capacity.)
(b)
With the front cover (lower side) removed, wiring of the main circuit terminals can be performed.

Removal and reinstallation of the operation panel and the front covers

• Press the upper edge of the operation panel while pulling
out the operation panel.
(b)
INSTALLATION AND WIRING
2
15

Advertisement

Table of Contents
loading

Table of Contents