Removal And Reinstallation Of The Operation Panel And The - Mitsubishi Electric FR-F802 Instruction Manual

Separated converter type
Table of Contents

Advertisement

2.2
Removal and reinstallation of the operation
panel and the front cover
Removal and reinstallation of the operation panel
• Loosen the two screws on the operation panel.
(These screws cannot be removed.)
To reinstall the operation panel, align its connector on the back with the PU connector of the inverter, and insert the operation
panel. After confirming that the operation panel is fit securely, tighten the screws. (Tightening torque: 0.40 to 0.45 N·m)
Removal of the front cover (lower side)
(a)
(a)
Remove the mounting screws to remove the front cover (lower side). (The number of the mounting screws differs by the
capacity.)
(b)
With the front cover (lower side) removed, wiring of the main circuit terminals can be performed.
Removal and reinstallation of the operation panel and the front cover
• Push the upper part of the operation panel and pull the
operation panel to remove.
(b)
INSTALLATION AND WIRING
2
15

Advertisement

Table of Contents
loading

Table of Contents