1.4 Work Flow
The following provides the work flow required until the equipment is turned on.
Unpack
Install this equipment
Connect hardware
Turn on the power
Install
extension boards
In case of installing an extension board,
see "6.3.4 Installing and removing an extension board."
See "1.6 Installation Environment."
See "1.7 Hardware connection."
See "2.1 Before Turning On the Power."
1-3
1. GETTING STARTED