Permeation Tube Installation; Figure 9-10. Installing Glass Tube Pt 1 - Thermo Scientific 43iQTL Instruction Manual

Trace level sulfur dioxide analyzer
Table of Contents

Advertisement

Optional Equipment
Internal Permeation Span Source
Permeation Tube
Use the following procedure to install the permeation tube.
Installation
CAUTION Allow oven to cool down prior to servicing.
L
1. Lift oven cover up.
2. Lift and unlatch two oven cover handles.
Figure 9–10. Installing Glass Tube pt 1
3. Unfasten nut. Loosen thumb screw 2X full counter clock rotation.
4. Loosening the thumb screw deflates the o-ring making it easier to pull
the thermistor assembly out.
9-19
Thermo Scientific
43iQTL Instruction Manual

Advertisement

Table of Contents
loading

Table of Contents