INSTALLATION INSTRUCTIONS FOR HEATING INSTALLER

7.1 General

All gas appliances must, by law, be installed by com-
petent persons (e.g. Corgi registered). Failure to install
appliances correctly could lead to prosecution.
It is in your own interest and that of safety to ensure that
the law is complied with.
The following instructions must be adhered to when the
Remeha Gas 610 ECO is installed:
- Gas Safety (Installation and Use) Regulations 1984
(as amended).
In addition to the above regulations, this boiler must be
installed in compliance with:
- Current I.E.E. Regulations for electrical installations
- Local building regulations
- The Building Standards (Scotland)
- (Consolidation) Regulations
- By-laws of the local water undertaking
- Health and Safety Document No 635 'The Electricity
at Work Regulations 1989'
It should also be in accordance with the relevant recom-
mendations in the current edition of the following British
Standards and Codes of Practice, viz. BS 6644, BS5978
Part 1 & 2, BS 5449, BS 5446, BS 6798, BS 6891 and
BG DM2.
Important:
The Remeha Gas 610 ECO is a CE certified boiler and
must not be modified or installed in any way contrary to
these "Installation and Maintenance Instructions".
Manufacturers Instructions must NOT be taken as over-
riding statutory obligations.

7.2 Delivery and installation

The Remeha Gas 610 ECO is supplied in 2 crates, with
a module in each crate. The flue gas collector is sup-
plied separately on a pallet. The overall dimensions of
the crates are 80 cm wide and 175 cm high with the
length dependant on the number of sections (2 x 6 sec-
tions: 170 cm, 2 x 7 to 9 sections: 209 cm). The base
of the crate packaging is a 76-cm wide pallet to enable
it to be transported with a pallet truck, forklift truck or 4-
wheel transport boards.
Excluding the crate each boiler module is 72-cm wide
c/w casing panels and 70 cm without casing and will fit
through most standard doors (minimum door opening
width 80 cm). Each boiler module has wheels so that,
once the packaging has been removed, it can easily be
moved around on a smooth surface.
Remeha Gas 610 ECO
i
The pallet lid can be used as a rocking ramp
to convey the boiler module over obstacles, such as
thresholds etc.
g
Important!!
transport purposes only and MUST NOT be used when
the boiler module is in its final position!
Once in position the boiler modules are fixed into posi-
tion using the fitted jacking bolts which both raise the
wheels of the ground and level the boiler modules.
Technical documentation is supplied with the boiler in
a holder on the inside of the boiler casing (beneath an
instrument panel). A number of small loose components,
such as the flue gas collector, the flue gas dampers, the
plinths and the 8 support pads have been placed on the
extra pallet.
Use the plastic packaging to protect the boiler until
required for use.
g
Important!!
required if site conditions warrant it – overhead builders
working, insulation etc.
Number of sec-
C in mm
tions
2 x 6
2 x 7
2 x 8
2 x 9
* Free space 800 mm, if instrument panel is facing the
short side.
g
Remove air inlet plates for room sealed installa-
tions
14
The wheels are designed for
Additional protection may be
D in mm
E in mm
1590
4380
1980
5160
1980
5160
1980
5160
5380
6160
6160
6160