Correct gas/air setup:
17.1. Connect the flue gas analyser, ensuring the connections are gas tight.
17.2. Run the boiler at full-load by pressing 'm'- and [+]-keys simultaneously.
17.3. When full-load speed is reached, check values against the table and adjust if
necessary using the ß screw on the venturi (see fig. 21).
Fig. 21
Setting screws
00W4H7900005
ß full load setting screw
Þ part load setting screw
boiler
model
Quinta 45
Quinta 65
Table 16 Setting data (open air box)
55979.indd 53
55979.indd 53
natural gas
Fan speed
O
2
(approx. rpm)
full
part
%
load
load
5200
1100
4.8
+/- 0.1
5200
1200
CO
Fan speed
2
(approx. rpm)
%
full
part
load
load
4600
1100
9.0
+/- 0.1
4600
1200
53
propane
O
CO
2
2
%
%
4.8
10.7
+/- 0.1
+/- 0.1