Docking Station Connections - Stihl RMI 522.0 C Instruction Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 99
Installing the docking station on a wall:
If the docking station is installed on a wall,
a recess (1) must be made on the left or
right of the floor plate using a pliers to
make space for the power cable (2).
118

9.2 Docking station connections

Removing the cover:
Pull the cover (1) apart slightly on the left
and right as illustrated and remove
upwards.
Opening the panel:
Fold the panel (1) forwards. Hold the panel
in the opened position as the hinge springs
will close it automatically.
The connections for the perimeter wire (1)
and the power cable (2) are protected
against the weather when the panel is
closed.
0478 131 9965 A - EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rmi 522 c

Table of Contents