Location And Environment; Cloudcore Account; Figure 2-3: Weatherproofing; Table 2-5: Environmental Specifications - Baicells Nova846 Installation Manual

Outdoor 8x5w two-carrier tdd enodeb
Hide thumbs Also See for Nova846:
Table of Contents

Advertisement

Nova846 Outdoor 8x5W Two-Carrier TDD eNodeB Installation Guide

Figure 2-3: Weatherproofing

2.5 Location and Environment

The Nova846 can be installed on a pole or a wall. For the best signal coverage, place the eNB in
an unobstructed location. In addition to network planning, when determining where to place the
eNB, you need to consider the best location for signal coverage. Avoid locating the eNB in areas
where there may be extreme temperatures, harmful gases, unstable voltages, volatile vibrations,
loud noises, flames, explosives, or electromagnetic interference (e.g., large radar stations,
transformer substations). Avoid areas prone to impounded water, soaking, leakage, or
condensation. Environmental specifications are shown in Table 2-5.

Table 2-5: Environmental Specifications

Item
Operating Temperature
Storage Temperature
Humidity
Atmospheric Pressure
Safety voltage

2.6 CloudCore Account

The Baicells CloudCore includes the EPC, managed by Baicells, and two operator applications: the
OMC, which is used to manage network elements, and the BOSS, which is used to manage
subscribers. If you have not already set up a Baicells CloudCore account, follow the steps below.
Step 1:
Open a web browser, and enter the CloudCore address (Figure 2-4):
https://cloudcore.cloudapp.net/cloudcore/
Step 2:
Click on the Sign up button.
Step 3:
Complete the mandatory fields, and again click on Sign up.
Description
-40°F to 131°F / -40°C to 55°C
-49°F to 158°F / -45°C to 70°C
2% to 95% RH
70 kPa to 106 kPa
-40 V to -58 V
14

Advertisement

Table of Contents
loading

Table of Contents