depth of the grounding electrode shall not be less than 27.5 in (0.7 m). The non-self-built
grounding network shall be connected to the grounding network of the owner.
8.
The eNB grounding, power adapter grounding, distribution box grounding and feeder
grounding must be connected to the grounding bar independently, and the grounding bar
must have a path from the lead to the earth.

3.6 Maintenance Chamber Waterproofing

Once the installation is complete, you must close the maintenance chamber of the equipment and
waterproof the chamber.
Clamp the power cord to the wire position, and seal the wire diameter 0.35 in
(9 mm
1 mm).
±
Put the Ethernet cable on the wire, and seal the wire diameter 0.28 in

3.7 Power on to Check LED Status

After the Nova846 is powered on, check that the LED indicators are lighting as expected and
described in Table 2-3
(section

3.8 Configure Basic Parameters

Reference:
Nova846 eNodeB Configuration Guide
The Nova846 eNB can be configured in Single Carrier (SC), Carrier Aggregation (CA), or Dual Carrier
(DC)/split mode, depending on which licenses you have purchased, and/or in HaloB mode, which
is embedded in the base software. The Nova846 also supports CBRS SAS operation.
When first installing and testing the Nova846, Baicells recommends configuring the primary cell
(Pcell)/Cell 1 carrier settings (without enabling CA, DC, HaloB, or SAS) for simple verification that
the new eNB unit is operational. Once it is confirmed to be operational, you can then refer to the
appropriate configuration guide(s) for the operating mode you plan to use.
NOTE: For all GUI menus and fields, refer to the following documents on the Baicells
website: Baicells.com > Resources > Documents.
CloudCore Configuration & Network Administration Guide (OMC/BOSS)
CPE Configuration Guides
Nova846 eNodeB Configuration Guide
Carrier Aggregation & Dual Carrier (Split Mode) Configuration Guide
HaloB Solution User Guide
SAS Deployment Guide
2.2).
25
0.04 in
±
0.04 in (7 mm
1 mm).
±
±

Advertisement

Table of Contents
loading

Table of Contents