Download Print this page

Hyundai HYSC75300 Manual page 25

Screw air compressor

Advertisement

S.N.
7
8
9
10
11
8. Equipment Installations
Installation site choosing and heat elimination and ventilation system
An installation site plan must be made to correctly use the air compressor to create good
environment for its operation and maintenance. A reasonable site must meet the following
requirements.
a) Air compressor must be installed indoor, which is clean, dry, ventilated, dust free and harmful
gases free.
b) Operating environment temperature shall not exceed 45℃. And the relative humidity of the
surrounding atmosphere shall be less than 80%.
c) The floor for installation shall be solid, smooth and horizontal.
d) If the planning site is an air compressor station, proper compressed air processing devices,
valves, pipelines and pressure containers shall be equipped according to relevant provisions. In order
to assure good heat dissipation and maintenance space, the distance between the air compressor
and the wall shall be no less than one meter and space of more than 1.5 meters shall be reserved on
the top to avoid wind bridge which is formed by the outlet hot wind and inlet cold wind. Exhaust
devices shall be equipped in the machine room which is badly ventilated.
9. Equipment Operation
9.1 Transportation shockproof fixation bolt shall be loosened before the
Name
Electric shock
hazard
No air leakage
Caution, hand
injury
Rotational
direction of the
motor
Danger, hot!
Symbol
Description
Please don't place the
equipment in wet places or
outdoors to avoid electricity
leakage due to reduction in
electrical insulation resistance
No air leakage here
Don't touch transmission part
Check rotational direction of
the motor during the process
of first starting up or changing
wire to avoid serious
breakdown to the machine
Hot surface, avoid burns

Advertisement

loading