Power Optimiser Troubleshooting - SolarEdge Energy Bank Installation Manual

Home hub inverter single phase for australia
Hide thumbs Also See for Energy Bank:
Table of Contents

Advertisement

Additional Troubleshooting
 1. Check that the modem or hub/router is functioning properly.
 2. Check that the connection to the internal connector on the communication board is
properly done.
 3. Check that the selected communication option is properly configured.
 4. Use a method independent of the SolarEdge device to check whether the network
and modem are operating properly. For example, connect a laptop to the Ethernet
router and connect to the Internet.
 5. Check whether a firewall or another type of network filter is blocking
communication.

Power Optimiser Troubleshooting

Malfunction
Pairing failed
PV string Voltage is 0V
PV string voltage not 0V but lower
than number of Power Optimisers
SolarEdge Home Hub Inverter Single Phase MAN-01-00812-1.5
Appendix A: Errors and
Possible Cause and Corrective Action
Power Optimisers are shaded.
If you connected the inverter to the monitoring
platform, retry pairing remotely (during sunlight).
Make sure to leave the inverter ON/OFF/P switch
ON and that S_OK appears in the status screen.
Power Optimiser (s) output is disconnected.
Connect all Power Optimiser outputs.
Power Optimiser(s) not connected in the PV
string.
Connect all Power Optimisers.
Panel(s) not connected properly to Power
Optimiser inputs (not applicable to smart
modules).
Connect the modules to the Power Optimiser
inputs.
PV string reverse polarity.
Check PV string polarity using a voltmeter and
correct if needed.
Troubleshooting   63

Advertisement

Table of Contents
loading

Table of Contents