SolarEdge Energy Bank Installation Manual page 8

Home hub inverter single phase for australia
Hide thumbs Also See for Energy Bank:
Table of Contents

Advertisement

CAUTION!
HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting
techniques, and if required - a lifting aid.
NOTE
The Connection Unit is NEMA type 3R rated . Unused glands should be sealed
with appropriate seals.
NOTE
Use PV modules rated according to IEC 61730 class A.
NOTE
The symbol
symbol is also used in this manual.
NOTE
The following warning symbols appear on the inverter warning label:
WARNING!
Before operating the system, ensure that the been grounded properly.
WARNING!
When handling the storage system battery, adhere to all manufacturer safety
instructions.
 
CAUTION!
This unit must be operated under the specified operating conditions as
described in the technical specifications supplied with the unit.
NOTE
The batteries must be certified according to local regulations and supported by
the SolarEdge inverter firmware.
SolarEdge Home Hub Inverter Single Phase MAN-01-00812-1.5
appears at grounding points on the SolarEdge equipment. This
Risk of electric shock
Risk of electric shock from energy stored in the capacitor. Do
not remove cover until 5 minutes after disconnecting all
sources of supply.
Hot surface – To reduce the risk of burns, do not touch.
Caution, risk of danger
IMPORTANT SAFETY INSTRUCTIONS
   7

Advertisement

Table of Contents
loading

Table of Contents