  Installation Guidelines
Frame-mounted Power Optimisers are mounted directly on the module frame,
regardless of racking system (rail-less or with rails). For installation of frame-
mounted Power Optimisers, refer to
http://www.solaredge.com/sites/default/files/installing_frame_mounted_power_
optimizers.pdf.
The Power Optimiser can be placed in any orientation.
Position the Power Optimiser close enough to its module so that their cables can be
connected.
Make sure to use Power Optimisers that have the required output and input
conductor length.
Completely shaded modules may cause their Power Optimisers to temporarily shut
down. This will not affect the performance of the other Power Optimisers in the PV
string, as long as the minimum number of unshaded Power Optimisers connected in
a PV string of modules is met. If under typical conditions fewer than the minimum
Power Optimisers are connected to unshaded modules, add more Power Optimisers
to the PV string.
To allow for heat dissipation, maintain the following clearance:
For All Power Optimisers, except for the M1600
Figure 1: Clearance for heat dissipation around the Power Optimizer
When installing PV modules in a confined space such as Building-integrated
photovoltaic (BIPV) modules, ventilation measures may be required to ensure that
the Power Optimisers are not exceeding the maximum temperatures stated in their
specifications.