ON/OFF/P switch:
ON (1) - Turning this switch ON (after Power Optimiser pairing) starts the
operation of the power optimizers, enables power production and allows the
inverter to begin exporting power to the utility grid.
OFF (0) - Turning this switch OFF reduces the power optimizer voltage to a low
safety voltage and inhibits exportation of power. When this switch is OFF, the
control circuitry remains powered up.
P - Moving and releasing the switch allows viewing system information via the
LEDs, and performing the following functions:
P Position
Duration
Switch moved
to P for 2
seconds, then
released.
Switch moved
to P for more
than 30
seconds, then
released.
Switch moved
to P for more
than 5 seconds,
then released.
LEDs
SolarEdge Home Hub Inverter Single Phase MAN-01-00812-1.5
Function
Displays (via
LEDs) production
information for 5
seconds, or error type
indications (if exist) for 5
seconds.
Activates the Wi-Fi
access point for
connecting to the
SetApp
Resets the communication
board
Starts pairing
Chapter 3: Installing the
Comments
While the switch is in P, all
LEDs are ON.
When the switch is released all
LEDs turn OFF for 0.5 sec and
then display the production or
error indication.
Reset is indicated by all 3 LEDs
fast blinking simultaneously
Pairing is indicated by all 3
LEDs blinking simultaneously.
Inverter   23

Advertisement

Table of Contents
loading

Table of Contents