Enabling Home Hub Applications - SolarEdge Energy Bank Installation Manual

Home hub inverter single phase for australia
Hide thumbs Also See for Energy Bank:
Table of Contents

Advertisement

48
  Enabling Home Hub Applications
Test Results
Charge failed
Discharge failed
Communication
Inverter switch is off
To show the last test results:
Select Commissioning > Maintenance > Diagnostics > Self-Test > Battery Self-
Test > Show Last Results.

Enabling Home Hub Applications

This section describes how to configure your system to use Home Hub applications.
Before enabling StorEdge applications, make sure to:
Finish the battery installation and configuration (refer to the battery installation
guide)
Run a battery self-test, as described above
Backup Power Applications
The produced power is stored in the battery to be used during power outages. When
the grid voltage is down, the Backup Interface automatically switches to the Backup
mode, disconnecting from the grid, while the SolarEdge Home Hub Inverter Single
Phase supplies power to the backed-up loads. This application requires connection to
the Backup Interface and backed-up loads (pre-selected or the entire home).
The application can be used in one of two ways:
Backup-only – energy stored in the battery is discharged for backup power only,
that is, when there is no power from the grid
Backup with Smart Energy Management– use some of the battery energy for
backup power, and the rest for maximize self-consumption(MSC) or charge/
discharge profile programming (for time of use arbitrage) applications.
Check that the power and communication cables
between the battery and inverter are properly
connected.
Check that the power and communication cables
between the battery and inverter are properly
connected.
Check that the communication cables between the
battery and inverter are properly connected.
Switch the inverter ON/OFF/P switch to ON.
SolarEdge Home Hub Inverter Single Phase MAN-01-00812-1.5