Access To The Expansion Box; The Scb-01 Expansion Pcb - REMEHA Quinta Ace 30 Installation And User Manual

High-efficiency wall-hung gas boiler
Hide thumbs Also See for Quinta Ace 30:
Table of Contents

Advertisement

5 Installation
5.5.5

Access to the expansion box

Fig.33
Access to the expansion box
1
2
5.5.6

The SCB-01 expansion PCB

Fig.34
SCB-01 PCB
Status
Status
Nc
C
No
Nc
Fig.35
Status notifications
Status A
Status B
Nc
C No
Nc
C No
Fig.36
0–10 V output connector
0-10
-
+
30
x3
AD-4000062-01
0-10
C
No
0
+
AD-3001514-01
AD-3001312-01
AD-3001305-01
If there is no space in the boiler's instrument box to install an (optional)
expansion PCB, install the PCB in the electronics expansion box This is
available as an accessory.
1. Unclip the housing cover.
2. Remove the cover.
3. Install the expansion PCB in accordance with the instructions
supplied.
The following is installed in the expansion box:
SCB-01 PCB.
The SCB-01 has the following features:
Two potential free contacts for status notifications
0–10 V output connection for a PWM system pump
Expansion PCBs are automatically recognised by the control unit of the
boiler. If expansion PCBs are removed, the boiler will show an error code.
To resolve this error, an auto-detect must be carried out after removal.
Connecting status notifications
The two potential-free contacts, Status, can be configured as required.
Depending on the setting, a particular status can be transmitted by the
boiler.
Connect a relais as follows:
Nc Normally closed contact. Contact will open when status occurs.
C Main contact.
No Normally opened contact. Contact will close when status occurs.
Select the desired status notification (setting) using parameter EP018 and
EP019.
Connecting 0–10 V output
The 0-10 contact can be used to connect a PWM system pump. The
speed of the pump is modulated based on the signal received from the
boiler. Depending on the make and type of pump, the pump can be
controlled by a 0–10 V or a PWM signal.
Connect the system pump controller to connector 0-10.
Select the type of signal that will be sent from the boiler using the
parameter EP029.
Select the type of signal that controls the pump using the parameter
EP028.
7684359 - v.11 - 13122021

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents