Section 4 Commissioning - Hach sc1000 User Manual

Hide thumbs Also See for sc1000:
Table of Contents

Advertisement

Section 4
网址:www.mamots.com
Commissioning
During initial commissioning, ensure all plug-in expansion cards, expansion modules, and
all sensors are correctly registered in the system.
1. Supply power to the controller. The LED indicator will turn red when the controller is
powered. When the LED indicator turns green, the touch screen calibration is
displayed automatically.
Note: When the LED is red, the reaction of the monitor may be slightly delayed.
2. Follow the touch screen calibration prompts. After the touch screen calibration is
complete the operating system starts and the sc1000 controller system automatically
prompts for the user language.
Note: Touch screen calibration is required for each user/operator.
3. Select the appropriate language and select OK.
4. The sc1000 automatically scans for connected sensors, then switches to display
mode and is ready for use.
For more information on using the display module, refer to
客服:400 688 9809
Section 5 on page
39.
电话:0431-85178766
37

Advertisement

Table of Contents
loading

Table of Contents