Figure 27
Removing the Insulation from the Communication Cable
31 mm (1.2 inches)
25 mm (1.00 inches)
20 mm (0.80 inches)
10 mm (0.40 inches)
1
3
1.
Cable, 2-conductor
2.
Connector, (network connector printed circuit board) 4.
Connection
1A
1B
2A
2B
网址:www.mamots.com
13. Tighten the union nut.
14. Set a terminating resistor at the last network connector to the ON position (see
Figure 30
and
Table 15 on page
15. Plug the connector into the probe module
Table 13 Communication Connector Terminal Assignments
Cable
Incoming
Incoming
To Further Devices
To Further Devices
34).
(Figure 31 on page
5 mm (0.2 inches)
4
3.
Network Cable installed in Connector
Circuit card/bottom shell, cable, and cable clamp
subassembly
Signal
A
B
A
B
电话:0431-85178766
Installation
客服:400 688 9809
34).
2
1A 1B
2A 2B
Length
25 mm (1 in.)
35 mm (1.4 in.)