GE PACSystems RSTi Manual page 78

Hide thumbs Also See for PACSystems RSTi:
Table of Contents

Advertisement

1
Chapter
1-64
Chapter
Check status of cable connection for each node.
Check that color matches between connector and cable.
Check wire omission.
Terminator resistor
If terminator resistor is not installed, install terminator resistor.
Check location of terminator resistor.
Configuration of Node address
Check duplication node address.
Configuration of Master
Check configuration of master.
Check whether to download.
Check composition is right
Configuration of communication baud rate
I/O size
Configuration of each nodes
Ground and environment
Check ground is contacted
Check environment factor (temperature, humidity, and so on) is less than regular
limit.
RSTi Network Adapter Manual User Manual - January 2012
GFK-2746

Advertisement

Table of Contents
loading

Table of Contents