3. INSTALLING AND CONNECTING
3.
The electrical installation is finished. The charging station is ready to be commissioned.
30
Alfen ICU B.V. | Installation Manual | Eve Single Pro-line & S-line | EV Charging Stations | V2.2 | EN | 04/2023 | 203130236-ICU
Need help?
Do you have a question about the Eve Single Pro-line and is the answer not in the manual?